MIL-DTL-55330D
4.4.3.3 Disposition of sample units. Sample units which have passed the inspections specified in
table II may be delivered on the contract if the lot is accepted and opened packs have been reprocessed.
4.4.3.4 Noncompliance. If a sample fails to pass the inspections specified in table II, the contractor
shall take corrective action on the materials or processes or both, as warranted, on all unit, intermediate,
and exterior (shipping) packs which can be corrected and which were processed under essentially the
same conditions, with essentially the same materials, and which are considered subject to the same
failure. Acceptance of the unit, intermediate, and exterior packs shall be discontinued until corrective
action has been taken and the applicable inspections specified in table II have been repeated on
additional sample units. All inspections, or the inspection which the original sample failed, shall be at the
option of the Government. Inspections specified in table II may be reinstituted; however, final acceptance
shall be withheld until the reinspection in accordance with table II has shown that the corrective action
was successful. In the event of failure after reinspection, information concerning the failure and corrective
action taken shall be furnished to the administrative contracting officer.
4.5 Materials inspection. Materials inspection shall consist of certification supported by verifying data
that the materials used are in accordance with the applicable requirements specified herein.
4.6 Methods of inspections and tests.
4.6.1 Visual and dimensional inspections. Unit, intermediate, and exterior packs shall be examined to
verify that the materials, Designs, methods, physical limitations, marking, and workmanship are in
accordance with the applicable requirements (see 3.1 through 3.6). Nonconformance is defined as one
or more defects as listed in table I.
4.6.2 Functional tests.
4.6.2.1 Rough handling. Packs shall be subjected to the applicable rough handling tests and the
interpretation of results or cause for rejection as specified in 3.5.1.1 and MIL-STD-2073-1.
4.6.2.2 Leakage. When a waterproof or water-vaporproof barrier is required, the unit pack shall be
subjected the applicable leakage test and interpretation of results specified in 3.5.1.2 and
MIL-STD-2073-1.
5. PACKAGING
5.1 Packaging requirements. This section is not applicable to this specification.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not
mandatory.)
6.1 Intended use. The preservation, packing, and marking specified herein are intended for direct
shipments to the Government. Unless otherwise designated, the general requirements (3.1) and marking
requirements (3.4) are applicable for the preparation of military specification connectors and accessories
for shipment from the parts manufacturer to non-Government activities.
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744