MIL-DTL-39032E
4.5.2.2 Leakage. When a waterproof or water-vapor proof barrier is required, the unit pack shall be
subjected to the applicable leakage test and interpretation of results as specified in 3.1.6.1.2 and
MIL-STD-2073-1.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging shall be as specified in the contract or order
(see 6.2). When actual packaging of materiel is to be performed by DoD personnel, these personnel
need to contact the responsible packaging activity to ascertain requisite packaging requirements.
Packaging requirements are maintained by the Inventory Control Point's packaging activity within the
Military Department or Defense Agency, or with the Military Department's System Command. Packaging
data retrieval is available from the managing Military Department's or Defense Agency's automated
packaging files, CD-ROM products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not
mandatory.)
6.1 Intended use. The preservation, packaging, packing, and marking specified herein are intended for
direct shipments to the Government and to OEM packaging distributors. Unless otherwise designated,
the general requirements (3.1) and marking requirements (3.1.5) are applicable for the preparation of
military specification on resistors and accessories for shipment from the parts manufacturer to non-
Government facilities.
6.2 Acquisition requirements.
6.2.1 Shipments to Government activities. Acquisition documents should specify the following:
a. Title, number, and date of this specification.
b. Levels of preservation and packing (see 3.1.2 and 3.1.3).
c. Quantity per unit pack, if other than specified (see 3.1.2.1.4).
d. If a unitized load is not required for shipment to one destination when total quantities are equal to
40 cubic feet or more (see 3.1.4).
e. Whether any other standard or special marking is required (see 3.1.5).
f. If FED-STD-123 is required for civil agency marking (see 3.1.5.1).
g. If a rough handling test is required (see 3.1.6.1.1).
h. If resistor functional tests is required (see 3.1.6.1).
i. If the contractor is not responsible for the performance of all inspection requirements (see 4.1).
j. If first article inspection is not required (see 4.3).
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business